sched/fair: Fix overly small weight for interactive group entities
Commit: 9d89c257 ("sched/fair: Rewrite runnable load and utilization average tracking") led to an overly small weight for interactive group entities. The bad case can be easily reproduced when a number of CPU hogs compete for the CPUs at the same time (thanks to Mike). This is largly because the task group's load average tracking cross CPUs lags behind the real changes. To fix this we accelerate the group share distribution process by using the load.weight of the cfs_rq. This may increase the entire group's share, but we have to do so to protect the (fragile) interactive tasks, especially from CPU hogs. Reported-by: Mike Galbraith <umgwanakikbuti@gmail.com> Tested-by: Dietmar Eggemann <dietmar.eggemann@arm.com> Tested-by: Mike Galbraith <umgwanakikbuti@gmail.com> Signed-off-by: Yuyang Du <yuyang.du@intel.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Acked-by: Dietmar Eggemann <dietmar.eggemann@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Link: http://lkml.kernel.org/r/1444699103-20272-1-git-send-email-yuyang.du@intel.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
Loading
Please register or sign in to comment