Skip to content
Commit 8314bc83 authored by Steve Muckle's avatar Steve Muckle Committed by Rafael J. Wysocki
Browse files

cpufreq / sched: ignore SMT when determining max cpu capacity



PELT does not consider SMT when scaling its utilization values via
arch_scale_cpu_capacity(). The value in rq->cpu_capacity_orig does
take SMT into consideration though and therefore may be smaller than
the utilization reported by PELT.

On an Intel i7-3630QM for example rq->cpu_capacity_orig is 589 but
util_avg scales up to 1024. This means that a 50% utilized CPU will show
up in schedutil as ~86% busy.

Fix this by using the same CPU scaling value in schedutil as that which
is used by PELT.

Signed-off-by: default avatarSteve Muckle <smuckle@linaro.org>
Signed-off-by: default avatarRafael J. Wysocki <rafael.j.wysocki@intel.com>
parent 12bde33d
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment