Skip to content
Commit e63da036 authored by Rik van Riel's avatar Rik van Riel Committed by Ingo Molnar
Browse files

sched/numa: Allow task switch if load imbalance improves



Currently the NUMA balancing code only allows moving tasks between NUMA
nodes when the load on both nodes is in balance. This breaks down when
the load was imbalanced to begin with.

Allow tasks to be moved between NUMA nodes if the imbalance is small,
or if the new imbalance is be smaller than the original one.

Suggested-by: default avatarPeter Zijlstra <peterz@infradead.org>
Signed-off-by: default avatarRik van Riel <riel@redhat.com>
Signed-off-by: default avatarPeter Zijlstra <peterz@infradead.org>
Cc: mgorman@suse.de
Cc: chegu_vinod@hp.com
Signed-off-by: default avatarIngo Molnar <mingo@kernel.org>
Link: http://lkml.kernel.org/r/20140514132221.274b3463@annuminas.surriel.com
parent 4027d080
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment