Skip task overlay in calcuating task description
- When a PiP task is dismissed with the PiP menu activity showing, we use the wrong task description (belonging to the menu activity) to draw the app theme snapshot. The task overlay is only used from SysUI to overlay an activity on top of the task, and should not be considered in the calculation for the task description for the task. Bug: 77964409 Test: Manual, launch Maps in PiP, dismiss and then open overview Change-Id: I2d537b9fdd19eb69a8dc20f15ac5b263584d2fad
Loading
Please register or sign in to comment